Cable Construction Notice

(1) Export cable pullin operations
- Vessel
Maersk Connector
- Estimated construction period
:8/29-9/3
- Location
SUB A (E 120°10'15.247", N 23°42'23.322")Wind farm YUN06 ( 120° 3'58" E, 23° 39'11" N)
- Other operation vessels
Falcon 5, Hermes IV, Echo2, Echo4, Feng Neng6, Feng Neng7

(2)Cable install operations
- Vessel
Siem Topaz & Hermes IV
- Estimated construction period
:8/31-9/5
- Location
SUB A (E 120°10'15.247", N 23°42'23.322")Wind farm YUN06 ( 120° 3'58" E, 23° 39'11" N)