- Update time:2023/5/31
- Cable Construction Notice
(1) Export cable pullin operations
- Vessel:Maersk Connector
- Estimated construction period:6/5-6/11
- Location:SUB A (E 120°10'15.247", N 23°42'23.322")-Wind farm YUN21 (E 120° 3' 21.984", N 23° 37' 37.024")
(2)Cable install operations
- Vessel:Siem Topaz
- Estimated construction period:6/12-6/18
- Location:SUB A (E 120°10'15.247", N 23°42'23.322")-Wind farm YUN21 (E 120° 3' 21.984", N 23° 37' 37.024")