1. Update time:2023/5/31
  2. Cable Construction Notice
    (1) Export cable pullin operations
    - Vessel:Maersk Connector
    - Estimated construction period:6/5-6/11
    - Location:SUB A (E 120°10'15.247", N 23°42'23.322")-Wind farm YUN21 (E 120° 3' 21.984", N 23° 37' 37.024")
    (2)Cable install operations
    - Vessel:Siem Topaz
    - Estimated construction period:6/12-6/18
    - Location:SUB A (E 120°10'15.247", N 23°42'23.322")-Wind farm YUN21 (E 120° 3' 21.984", N 23° 37' 37.024")