1. Update time:2023/6/12
  2. Cable Construction Notice
    (1) Export cable pullin operations
    - Vessel:Maersk Connector
    - Estimated construction period:6/18-6/24
    - Location:SUB A (E 120°10'15.247", N 23°42'23.322")-Wind farm YUN20 (E 120.032638 , N 23.625344)
    - Other operation vessels:Falcon 5, Hermes IV, Echo2, Echo4, Feng Neng6, Feng Neng7
    (2)Cable install operations
    - Vessel:Siem Topaz
    - Estimated construction period:6/23-6/30
    - Location:SUB A (E 120°10'15.247", N 23°42'23.322")-Wind farm YUN20 (E 120.032638 , N 23.625344)