Already on March 16th, a transport vessel with five nacelles of this type (Siemens Gamesa 8.0 167 DD) will be on its way to Aalborg to load an additional 15 rotor blades. Then it will immediately head for Taichung (Taiwan), where the nacelles and blades will be temporarily stored and prepared for the assembly. Calculated arrival time is between April 30 and May 2, 2020.